This bar/restaurant premises was completely stripped out, ready for a planned refit by Urban Leisure Group. Strip Out were tasked to strip out and remove all shop fixtures, fittings,commercial kitchen with extraction system and all WC blocks. A complete strip out of the dry lined walls, MF ceiling and wooden flooring was carried out. The AC system were de-gassed and removed. A clean site was handed over.
- Project Value – £16k
- Duration of Works – 14 Days
- Complete Cat “A” bar / pub strip out
- Team – 5 Men
- Specialists – AC degas & F-Gas recovery
- Total Waste Cleared – 31 Tonnes
- Site Safety – 100%