The consulting offices at Pulse HQ were part stripped out to allow for a new modernised refit. The strip out project consisted of the removal of all fixtures and fittings, partitioning, ceilings, power/data and floor coverings. This project was located on the ground floor with good access and egress from the building, allowing Strip Out to use our own battery powered mini-dumpers to load and transport the waste to the loading area. A clean was handed over to the fit out company.
- Project Value – £16k
- Duration of Works – 7 Days
- Part Cat “A” soft strip out of East & West office floor wings
- Team – 5 Men
- Total Waste Cleared – 19.2 Tonnes
- Specialist mini battery powered dumpers used
- Site Safety – 100%