Abstract – Southgate

Pro Site were tasked to carry out a full Cat”A” strip out and clear from site the 1st floor the principal main contrator Abstract Interiors. The project consisted of a complete floor soft strip out. The floor was completely striped out and cleared of all ceilings and de-mountable partitioning. All lighting and the power installation was removed back to the incoming supply. A total of 42 wall mounted HVAC unit were derained down and removed/recycled.

  • Project Value – £28k
  • Duration of Works – 12 Days
  • Full Cat “A” strip out for the Principal Main Contractor
  • Team – 5 Men
  • Total Waste Cleared – 16 Tonnes
  • Site Safety – 100%